How Long Does A Kitchen Remodel Take? Timeline And Steps

If you are wondering how long does a kitchen remodel take you will have to consider all of the elements. The timeframe for your kitchen remodel depends on complexity, the size of your space, and the scope of the work. For example, if you are not altering the layout,  not changing electrical or plumbing, and using cabinetry and appliances, it’s reasonable to expect that your kitchen renovation timeline will be extended for a few weeks. If you are moving your kitchen from one part of your home to another, you will need both city permits as well as board approvals, and using imported custom cabinets—you should give it several months. The wide timeframe range is due to the fact that there can be many moving parts and multiple parties involved. Certain aspects will most likely be beyond your control when estimating how long does it take to remodel a kitchen. Based on the scope of your remodel and if you are doing major or minor kitchen reno, the length of your project will depend upon several factors.

Kitchen remodels are unique because they require a lot of moving parts and coordination of electricians, plumbers, and other subcontractors, some of whom must wait for the work of others to be completed before they can proceed. Kitchen remodel timeline should include sourcing all the required materials that are usually cumbersome and large which make the installation process longer and more difficult.

HOW LONG DOES A KITCHEN REMODEL TAKE? YOUR NYC KITCHEN REDO TIMELINE

How long does a kitchen remodel take will be affected a lot by the decisions you make in the beginning. When you look at the steps to remodelling a kitchen you can come to the conclusion that the average kitchen makeover takes 6-8 weeks, in case you deal with a reputable contractor with extensive experience with building, installation, plumbing, and electrical renovation. If you do the remodel yourself or choose a cheaper, less experienced contractor, you may expect the average time to renovate a kitchen to take significantly longer because of the likely unexpected hiccups. General estimates regarding how long does a kitchen remodel take will vary based on the size of your space and kitchen design. The average kitchen remodel will take 6-8 weeks, more intricate larger kitchens could take up to 10-12 weeks. Complete, large kitchen remodeling projects will most likely take longer, up to 3-5 months in total.

KITCHEN REMODEL TIMELINE CHECKLIST The kitchen is a valuable section of your home, requiring substantial electrical wiring, plumbing, and appliances, as well as sturdy flooring, cabinets, countertops, and much more. The more of these design elements you choose to replace, the longer your kitchen remodel timeline takes to finish and possibly be delayed, thus for longer remodels you’ll have to find alternative food and cooking arrangements. So think about it and be sure to make arrangements beforehand. To complete a successful kitchen renovation in NYC having a predefined schedule is a must. Your contractor lays out all of the steps to be completed in sequence so that your kitchen remodel is a success. Nonetheless, even with the most carefully planned renovation projects, delays can occur—not necessarily because of incompetence or carelessness. A lot of specialty subcontractors and many special-ordered products are involved in a kitchen renovation timeline. That can make for tricky scheduling. When thinking how long does a kitchen renovation take you should know little delays are bound to happen. Most of the time they are smoothed over by project management or contractor so that the snags-if they occur- isn’t the end of the world.

BEFORE CONSTRUCTION

Before thinking about how long does a kitchen remodel take and starting your kitchen remodeling process, your primary goal is to gauge your wants vs. your needs. In this step, you should go over your inspiration and start planning. During this process, you should start looking for the perfect contractor and acquire all the needed permits for the remodel and source all of the needed materials. This step can last anywhere between a few days and few weeks, depending how long you want to take to get inspired and plan all the details.

INSPIRATION AND PLANNING

You want to see what must go into your remodeled kitchen to form decisions practically. You should start by deciding the things you essentially need within the kitchen so you can move on to the aesthetic element of it.

While making decisions about the renovation and thinking about how long does it take to remodel a kitchen, you must consider the resale value of a house and what you’re willing to invest in it. Consider the financial payback on replacing a kitchen. If you’re about to remain in your house for several years, a dream kitchen might be definitely worth the high cost since it’ll become a functional and attractive family space for several years. But if you’re a parent who plans to downsize to a smaller house within the following five years, perhaps a surface-level kitchen renovation is de facto the more practical option.

 All of these considerations are crucial before making any decisions and they will effect your average time to renovate a kitchen. This could help you be more flexible with any last-minute expenses. After you have set your kitchen remodeling budget, it is time to plan the layout of your kitchen. The 5 classic kitchen design plans are U-shaped design, One Wall Design, L-shaped Design, Corridor Design, and Double L Design. Select one layout plan that is best fitted to your kitchen space, and develop a blueprint with general contractors, interior designers, design software, and kitchen design packages. Once you know how long does it take to renovate a kitchen, and before you begin to demolish your kitchen you should brace yourself to live without your kitchen. Make some space within the house and shift your functional kitchen appliances to form yourself a quick kitchen for the time being. Kitchen remodels often return an honest portion of their cost in improved home equity—but not all of it. Right from the beginning at the designing stage, establish a mindset and be willing to search for methods to cut costs on your kitchen remodeling project and shorten the kitchen remodel timeline. By far, the most cost-efficient decision you can make is to offload most of the planning, design, and management of workers to a general contractor.

FINDING A CONTRACTOR

When trying to minimize how long does it take to remodel a kitchen Inspiration photos are optional but valuable to seek out your contractors who have done similar styles. Include the other information that may help match you with the proper contractors. Read reviews from clients and photos of their past projects to determine whether or not they can be a decent fit for your particular project.

Decide which contractors you’d prefer to meet up with and brace yourself for an on-site visit, this way you’ll get the best sense of how long does it take to renovate a kitchen. An in-person visit is the best way for a contractor to get to know the scope of the project, and the physical possibilities, figure out how long it takes to remodel a kitchen like yours, and therefore the limitations of the space. You’ll also see if personalities and communication styles match. You ought to expect a written bid within 5-7 business days after your visit. Once all the written bids are available, it’s time to check and compare! If you’ve got follow-up questions on how long does a kitchen renovation take, now could be the time to ask. Once you’ve selected a contractor, he or she’s going to put together a contract for you to review. This can typically include an outline of the work to be done, a top-level view of the prices, as well as the timing of payments throughout the project. Once you’ve met and interviewed some home kitchen contractors, you must narrow them right down to ones that are 1) within your budget and 2) you clicked with 3) how long does a typical kitchen remodel take for that company specifically. These criteria are a decent place to start out, also remember to keep in mind that the most cost-effective option isn’t always the most effective option.

We suggest every homeowner perform as many vetting steps as possible to shield themselves, but a minimum of the subsequent five: Check their reviews online, do a contractor license lookup online, get a copy/sample of their insurance certificate, call at least 3 references, and do interviews. Once you’ve selected the most effective kitchen contractor for your remodel and know how long does a kitchen renovation take they’re going to send you an understanding to sign which incorporates the scope of labor, cost & contractual terms. Every contractor uses a special legal document, so read it carefully and make 100% certain you realize it and are comfortable with the terms. If you don’t understand something, ask the contractor for proof. Also, ensure the contract includes a project payment schedule that permits you to form reasonable payments that match the progress of the work.

GET PERMITS

It may be a surprise for a few people after they discover how long does a kitchen renovation take, and that everyone but the foremost straightforward kitchen renovation jobs requires permits. Significant modifications that affect the number of sunshine, ventilation, fire resistance, or exterior exits will need one. This will also affect your kitchen renovation timeline, so you should make allowances ahead of time. Whether you would need a permit for a kitchen remodel varies per the kind of remodel you’re undertaking and where you reside. But experts agree if you want to be safe it’s best to first seek advice from your city government. Of all the steps that can determine how long does it take to renovate a kitchen and where hiccups or delays might occur, this is it. Obtaining the proper permits and necessary approvals have delayed many a renovation, but don’t worry. Contractors are well-versed in navigating these processes and sometimes can advise you on a way to achieve your renovation goals with the smallest amount of hassle and on your kitchen remodel timeline. If you’re moving plumbing or gas lines, you’ll need an architect and extra DOB permits. With good contractors, homeowners have reported obtaining approvals in as little as two weeks—but it’s more common for it to require months. If you’re making structural changes (ie: taking down or adding any interior or exterior walls) you will definitely need permits, and bear in mind that if you’re submitting for a full permit there are times when the town will have special zones to review the plans before you’re approved for the permit. All of this should be taken into account when planning how long does it take to renovate a kitchen and how long would your specific project take.

If you reside in a stand-alone house, your kitchen remodel timeline will be shorter since you won’t have to worry about building board approvals. However, you’ll still need the requisite city permits for any electrical or plumbing work to make sure everything is up to code. If you’re after a mostly cosmetic change, like repainting cabinets, installing new countertops or replacing a faucet, installing new flooring, refacing cabinets, and installing new lighting fixtures,  you probably won’t need a permit for your kitchen remodel.

SOURCING MATERIALS

If you’re accountable for sourcing all or a number of the materials in your renovation, to shorten your kitchen remodel timeline as much as possible, make sure to put in the orders as soon as possible because the design plan is finished. How long does a typical kitchen remodel take will be delayed by certain items have long lead times, and you don’t want that one faucet to stall up the whole renovation. If time could be a concern, examine what’s currently available and prepared to ship. Speak together with your contractor about keeping to the average time to renovate a kitchen by timing the merchandise delivery to coincide with the time of installation. After you start pondering kitchen cabinet hardware ideas 2022, and selecting materials, the primary and most vital selections you ought to start with are the kitchen cabinets and appliances. The appliances are crucial to pick out early because their size & location will dictate the layout of the kitchen cabinets. This can hugely help you keep to your kitchen remodel timeline. How long does it take to renovate a kitchen with respect to the cupboards, you’ll have to select a method, material & color as soon as possible so the contractor can get them organized. In many cases, manufacturing the cupboards (especially custom cabinets) is the longest wait time during a kitchen renovation and the thing that prolongs the kitchen renovation timeline the most.

The next materials that are the most important or time interval to delivery are the following: Flooring, tile, sink, and countertops. Because it’s always hard to assume whether any specific variety of material is available, back-ordered, or has supply issues, it’s always best to pick and buy items well before they have to be installed so you know how long does a kitchen renovation take. Remember that items like windows & countertops must be custom-made or fabricated. The last items to order that you’ll have to select or buy are things like faucets, lights, paint color, & cabinet hardware.

DURING THE CONSTRUCTION

During this step in the kitchen remodel timeline you will start the demolishing of the old kitchen. Next comes the installation of the new countertops, appliances and hardware. The demolition itself can usually be done in as little as 2 days depending how much you are taking out. Likewise, the installation times will vary depending on the type of countertops, cabinets and hardware you are having put in. You should plan this step to take anywhere from 2 to 4 months.

DEMOLISHING

Out with the old! Now that you’re through with the paperwork, it’s time (for your contractor) to get up that sledgehammer and keep on that kitchen renovation timeline. Items that are remaining in their spot should be protected with a tarp or plastic. Checking how large your kitchen is, and the extent of the renovation shouldn’t take more than a few days. The preparatory step of any kitchen refurbishment is demolition. Before you know how long does it take to remodel a kitchen and you’re able to create a fine-looking new space, it’s important to demolish and eliminate what’s outdated or exhausted. This can be the time after you remove anything you don’t want to stay including walls, cabinetry, flooring, fixtures, or more. Some property owners enjoy handling this phase themselves, but it’s usually best to rent a licensed contractor to complete the work if you really want to stick to your kitchen renovation timeline. Experienced teams possess the knowledge to avoid plumbing and pipes hidden behind walls or beneath cabinets thus keeping to the average time to renovate a kitchen. If you are trying to handle this part yourself, ensure to shut off the water before starting. Also, it would be a good idea to sort out a  dumpster or a trailer for hauling the debris away ahead of time.

You are looking forward to smashing up your old cabinets and pulling out that outdated linoleum flooring? The demolition phase focuses on clearing everything from your kitchen so you’ll be able to start with a blank slate and keep your average time to renovate a kitchen low. Before you go heavy with the hammer, consider donating your old kitchen cabinets and appliances if they’re still in fine condition. Donating the current elements of your kitchen is a clever option if you are looking to eliminate everything fast and it’s going to save you a bit of money on waste removal. However, if you select to resell, you’ll put that cash toward your funds for the renovation and it might end up affecting how long does it take to renovate a kitchen in your case.

INSTALLATION

Make sure the flooring you select is consistent throughout the area, whether or not they’re hidden. If you choose in the future to reconfigure the cupboard layout, the floors won’t need to be redone, thus saving you time and money and affecting how long does a typical kitchen remodel take. Installation of all other materials is typically finished in this order: cabinets, appliances, fixtures and lighting, counters, backsplash, and cabinet hardware. Aspects of your kitchen renovation timeline might vary, it all depends on site conditions, and also how far along you’ve gotten with the sourcing of the materials. After drywall, it’s time to put in any doors or windows. If you’re sticking with the identical structure as your old kitchen, you would possibly not need to do anything for this step. Simply take the time to wipe down your old ones with a decent cleaner and seal any existing cracks around the windows with caulk to assist in insulating them more effectively.

If you are worried about adding new doors or windows to the space and how that might affect how long does a kitchen renovation take, do make sure to insulate them properly. A majority of a home’s energy cost annually comes from lost hot and cold air. Unsealed kitchen windows not only make your space less comfortable, but they might also cost you loads of cash in heating and cooling bills further prolonging your average time to renovate a kitchen.

When thinking how long does a typical kitchen remodel take you should count on all the little, mundane tasks. Like making sure they have the trim installed on kitchen cabinets seamlessly. Failure to try and do so has the potential to make gaps, which could cause bigger problems further on into the renovation timeline.

Next within the kitchen renovation timeline process comes the installation of kitchen countertops and plumbing fixtures, this can also be the time for the installation of the island. In many cases, it’s the best part of the project as you’ll finally see the finished look start to form shape and see the end of the road is near. If you are wondering about all the steps regarding the process you can read more about it in our kitchen countertops guide article. Just imagine that big rustic sink you’ve had your eye on for months finally making a grand appearance in your redone space!

Examples of items that mandate adding to a kitchen at this point contain the sink, faucet, and disposal systems. This is often a time when some minor plumbing issues might reveal themselves. How long does a typical kitchen remodel take and how long the fixing of the problem would last, will vary. If necessary, contact a talented professional for advice or help.

After installation of the cupboards and plumbing fixtures, it’s time in your kitchen remodel timeline to install your new appliances. This includes items like the built-in microwave, stove, refrigerator, and more. If you’re adding luxury items—such as a wine cooler or water filtration system—this is the time to complete these installations, as well.

Now it’s down to finally installing that kitchen black hardware you picked out months ago and the new floors. This is often a small step for many home renovation professionals and only minorly effects the average time to renovate a kitchen. Some favor handling tile or wood installation before cabinetry. Others feel it’s best to avoid leaving it for last, and plenty of contractors choose to make this decision on a project-by-project basis.

Select colors and designs that match your unique taste and elegance ahead of time to further speed up your kitchen renovation timeline. With such a lot of different options on the market—vinyl, ceramic, wood plank, there’s something to appeal to any space.

AFTER CONSTRUCTION

In this stage, you will undergo inspections of the complete kitchen and do a final walkthrough with your contractor to make sure everything is up to snuff and to your liking. This can be done in a day. The only thing that could prolong it is in case anything was overlooked or needs to be fixed and changed, so it will influence the timeline on a project-to-project basis.

FINAL WALKTHROUGH

Once the kitchen remodeling process is over, you want to inspect the complete kitchen carefully so make sure you set time aside in your kitchen remodel timeline specifically for this. If you have hired a general contractor to try to do the work, inspect the completely remodeled kitchen alongside him. In the end, you ought to let the contractor know if you’re unsatisfied with anything even if it affects how long does it take to renovate a kitchen.

A kitchen renovation timeline will also be altered by an official review of officers who will inspect your kitchen before stamping your permit application as complete. You’ll ask your contractor to arrange for such an inspection. DIY projects mean you need to arrange them yourself.

KITCHEN REMODELING TIMELINE FAQ

The typical US kitchen takes approximately 6-8 weeks to renovate, assuming that you just work with a reliable contractor that has a lot of experience keeping to a kitchen renovation timeline. If you are wondering how long does a kitchen remodel take read on to get all the info you will need.

CAN YOU REMODEL A KITCHEN IN A WEEK?

You may have heard horror stories about kitchen remodels taking months to be completed. It’s hard to believe that you simply can be enjoying your new room in barely a week. Although it’s hard to believe, a 1-week kitchen remodel timeline is truly possible. We all know you’re thinking how long does it take to remodel a kitchen and “How are one-week kitchen remodels possible?”

The key to a 1-week kitchen remodel is planning. It starts with a consultation. You wish to understand what kinds of options are available for your home and obtain ideas of how you would like to upgrade and update your home. This is often when it’s a decent idea to think about what you quite like about your kitchen and what doesn’t work for you, as it will influence how long does a typical kitchen remodel take.

HOW LONG DOES IT TAKE TO RENOVATE A SMALL KITCHEN?

Ideally, kitchen experts believe that it a kitchen renovation timeline should be about six to eight weeks to rework a petit kitchen. It includes an extended process, including plumbing, electricals, fitting new appliances, and final finishes. If you haven’t planned and finalized things, it can add another fortnight to how long does a kitchen renovation take. A tiny kitchen will be renovated in just a day or two. Basic repairs, like painting and replacing cabinet doors, are usually quick and simple. More complex tasks, like installing new flooring or cabinets, may take a small amount longer but are still doable during a day or two.

WHY DOES IT TAKE SO LONG TO REMODEL A KITCHEN?

The kitchen may be a very complex part of your home – it requires extensive electrical wiring, plumbing, and appliances, and sometimes involves a fancy architecture design process as well as durable flooring, cabinets, countertops, and far more.

The more of those design aspects you wish to alter, the more it will change how long does a kitchen remodel take, so you’ll need to seek out alternative food and cooking arrangements for extended remodels. Your kitchen needs heating, electrical wiring, extensive plumbing, a robust cabinet set, durable flooring, suitable countertops, and all the built-in appliances (ovens, microwaves, etc.) and it must be designed so the space will be used easily. Before you’ll be able to even begin your kitchen renovation timeline and the entire process, you would like to organize and demolish your old kitchen. This can be especially complicated if you’re changing the layout of sinks and ovens, requiring the electrics and utility to be totally reworked to create sense with the new project design. What style of floor you decide on is going to be an important factor to consider when it comes to the average time to renovate a kitchen. As an example, ceramic tile can take around three to four days to finish and wood flooring may take up to four to 6 days. These are averages but it does offer you a vague idea of the kitchen remodel timeline.

As such, the kitchen renovation timeline and installation is far longer and subject to unexpected changes! If you’re installing granite countertops, their fabrication takes around 10 days. Once they’re fabricated, the slab is formed, delivered, and installed by a craftsman with experience in construction, installation, and plumbing and electrical renovation.

The final phase of a kitchen renovation timeline contains the installation of your electrical fixtures and new appliances. Once that’s done, the shutdown is completed and you’ll be able to finally use your new kitchen.

How long does a kitchen remodel take varies from site to site but plan on a few six to eight-week timeframes for an average kitchen.

HOW FAST CAN A KITCHEN REMODEL BE DONE?

We often hear the question: “How long does it take to remodel a kitchen?” Full kitchen renovations that include changes in plumbing and electrical service locations, together with all new appliances, products, and finishes, can take anywhere between 3 to five months all depending on the scale and complexity of the kitchen. Smaller cosmetic updates, like new cabinets, countertops, and backsplash with no plan changes are often done as quickly as a couple of weeks. The average time to renovate a kitchen on which you can rely will hugely depend on the scale of your space and therefore the form of design. The sort of renovation being made is important as well. If you’re planning on replacing countertops without replacing cabinets, which will take much less time to renovate.

HOW LONG DOES IT TAKE TO DO A KITCHEN REMODEL?

The first step after you are done making all of your design decisions are for the present kitchen to be taken out will impact how long does a kitchen remodel take. This demolition stage comprises removing your current cabinets, flooring, countertops, and appliances. This may typically take 2 days approximately and it will prepare your kitchen for your new style. Here are some general estimations for the timeline to expect: the common US kitchen renovation takes 6-8 weeks, larger or more complex kitchen remodel timeline can take anywhere from 10-12 weeks while full, large kitchen remodeling undertakings are going to take longer, often between 3 to five months.

LOOKING FOR A QUICK AND QUALITY KITCHEN REMODELLING TEAM? HIRE ATMOSPHERE KITCHEN & BATH

Atmosphere Kitchen & Bath can supply you with an intensive range of designs, materials, and finishes ensuring the top result you envisioned. As a premier NYC kitchen remodeling company, we’ve got a good range of suppliers which implies that we are able to provide you with the most effective deals available on an impressive choice of products. Not every look will fit into every kitchen which is why it’s important to gather as many ideas as you can find, to inspire yourself. We compiled the exact steps you should take, that may help you finish your kitchen remodel timeline as pain-free as possible. If you are ready to start your kitchen remodel project, contact us today!